PROJECT: MAERSK/LF LOGISTICS FACTORY

Project Features:
– Our work scope includes design, build and all kind of permits (fire prevention-fighting, construction permit) and installation of cool warehouse and finishing office.
– The cool warehouse is installed with a ventilation system, a required range of temperature and humidity, super energy saving system with PLC automatic control mode.
-The automatic temperature and humidity control system with its reporting function via phone messages, emails and its application.

Project name

MAERSK/LF LOGISTICS FACTORY

Location

VSIP2 IP, THU DAU MOT CITY, BINH DUONG PROVINCE

Investor

MAERSK/LF LOGISTICS (VIET NAM) COMPANY LIMITED (DENMARK)

CFA (M2)

<10,000 m2

Duration

3 months

Package

MAIN CONTRACTOR

Other projects