Scale/ Features:
– YAZAKI factory in Tra Vinh was built on plots C and H in Long Duc Industrial Park, Tra Vinh province with a total area of 88,954.5 m2; Construction area is about 53,753 m2; construction density 60.42%; Total construction floor area is about 53,753 m2; Land use coefficient for the entire area is 0.6 times; Green tree density is 25.5%.
– Total expected project investment: about 1,028 billion VND.
– Internal traffic: Heavy-duty reinforced concrete road solution on cement-reinforced ground.
– Rainwater drainage system: Prefabricated and assembled reinforced concrete ditch solution.
– Kajima Road Vietnam, a leading contractor from Japan, awarded us the package of road & drainage and external works.